The ignition of two 8100TEU dual fuel powered container ships in the new era of shipbuilding has started

On the morning of May 23rd, New Era Shipbuilding held a ship ignition and commencement ceremony at the three spans of the steel processing workshop in the new area. The structural components of the 8100TEU dual fuel powered container ships 3 # and 9 # began prefabrication. The heads of relevant departments such as Production Management Department, Quality Department, and Marketing Department, along with the shipowner, CONGLOMERATE MARITIME LIMITED LR&BV classification society representatives attended the event.
The shipowner CONGLOMERATE MARITIME LIMITED has ordered 10 8100TEU and 10 11400TEU dual fuel powered container ships in New Era Shipbuilding. Among them, the 8100TEU dual fuel powered container ship has a total length of 260 meters, a width of 45.6 meters, a depth of 24.7 meters, a design draft of 12.5 meters, a structural draft of 15.5 meters, an air height of 62.5 meters, and a load capacity of 97500MT under the structural draft.
Related News