Beihai Shipbuilding starts construction of two 210000 ton bulk carriers for CMB on the same day

On December 23rd, the commencement ceremony of the Belgian CMB 210000 ton bulk cargo ship project No. 45 and No. 54, constructed by China Shipbuilding North Sea Shipbuilding, was held in the joint factory of the company's shipbuilding area one. At 15:58, representatives from the shipowner, ship inspection, and various units of the company jointly launched the crystal ball, and the project was successfully launched.
The 45 and 54 ships that started construction this time have a total design length of 300 meters, a depth of 25.2 meters, a structural draft of 18.4 meters, a service speed of 14.5 knots, and a load capacity of 209800 tons. They are the continuation ships in the CMB "ammonia fuel" series. The ship has been adjusted and optimized in terms of structure, system, equipment, etc. based on the BC210K-47 series ammonia reserved bulk carrier. The design intends to adopt the Win GD 6X72DF-A-1.0 dual fuel aircraft model, highlighting the company's environmental protection concept of green shipbuilding, expanding the development space for "zero carbon" operation of ships, and demonstrating the foresight and creativity of Beihai Shipbuilding in promoting the green development of the shipping industry.
To ensure the commencement and continuous production of the project, all units closely cooperate, overcome difficulties, and make every effort to win the final battle, welcoming 2025 with a new attitude.
Related News